Back to jobs
Foremen
Roles & Responsibilities
Position: Foreman
Reporting to: Site Supervisor Department: Construction
Job Purpose:
To ensure those persons under your immediate control are working consistently within company procedures while also following good practice and statutory legislation.
Key Objectives:
Assist the Site Management Team in the safe and timely completion of any work requested in all aspects of the following items, but not limited to:
- SHE – Safety, Health and Environment
- Programme
- Quality
- On time project delivery through personnel management
- Ensure RAMS / task briefings / lift plans / permit systems are in place and being worked to by operatives with particular emphasis being on the implementation of the necessary measures.
- Ensure a robust task briefing sheet is completed and signed by all members of your team prior to any work Ensuring work area hazard assessments are carried out.
- Ensure all labour under your control are adequately trained for the
- Ensure plant, equipment and PPE are utilised as appropriate and in line with company procedures and current
- Ensure persons working under your control are carrying out their duties in a manner that does not endanger themselves or
- Ensure that all work areas are suitably cornered off (barriers and signage) to prevent access from unauthorised
- Being aware of and ensuring squad compliance with project / company policies and
- Ensure site file 3 is fully populated and daily / weekly checks are carried out and recorded including items such as PPE checks, plant checks and electrical equipment
- Ensure all accidents, incidents or near misses are reported immediately to the Site Management
- Recognising, addressing and resolving issues / problems among / between squad
- Ensure all company quality procedures are being followed e. Bolt connections check sheets, Seversafe check sheets – Raising of faults (NCR’s)
- Ensure all work carried out by those under your control is to a suitable high standard of quality befitting
- Ensure correct GA drawings, bolt location lists, temp works sequences are being followed.
- Counselling and mentoring of juniors and trainees under your
- Keep records as required to protect the company’s interest, such as piece counts/ crane use / down time / delays / O being worked on.
- Maintaining work standards and outlining behaviour expectations to ensure squad morale and
- Working with your squad to overcome work challenges and reassess daily goals to meet forecasted
- Liaise closely with the Site Manager / Supervisor to ensure material deliveries are ordered to maximise site progress and
- Ensure site management is made aware of lateness / absenteeism of your team
- Ensure use of Donseed system
- Ensure compliance with site working hours and shift patterns from you and your team including adhering to break
- Ensure your team members have suitable equipment to carry out the tasks
- Ensure orders for new equipment / PPE are requested through the Site Management
- Ensure all tools and equipment under your control are signed for and kept to a high standard – Any damage or losses should be reported to Site Management with immediate
- Ensure all plant being used by you has been checked with the relevant documentation completed, prior to use – Report and damage to site management with immediate
- Set an example to
Apply for this job
*
indicates a required field